[Case Study] Completed a conveyor line including a drop-down conveyor in a short period of time.
Completed a conveyor line, including a custom drop-down conveyor, in a short period!
A food manufacturer is considering updating their product transport line and has requested a quick response, including design, as some special specifications for the conveyor will be necessary. Issues: 1. There are areas in the conveyor line that cross emergency evacuation routes, and we want to ensure that a clear passage can be easily secured during an evacuation. 2. After the specifications are determined, we want to complete everything from design to installation and trial operation in about one month. 3. There are products that are about 45mm in size, which are small and light, but we want to ensure smooth transitions between conveyors.
- Company:蒲田工業
- Price:Other